Hawai'i Scientific Drilling Project

 

Description

Big Island of Hawai'iThe Hawai'i Scientific Drilling Project (HSDP) has completed its first phase of core drilling into the Mauna Kea Volcano at a depth of 3,109 m in September 1999. These are the deepest core samples obtained from any Hawai'ian volcano and the suite of rock samples recovered may be the longest continuous stratigraphic record from any ocean island volcano.

(Photo ©: NASA)

The primary scientific objective of the HSDP is to gain a better understanding of the geochemical and geophysical processes within mantle plumes forming "midplate" volcanoes such as Hawai'i, the Galapagos, and the Yellowstone volcanic system. To achieve this objective, the project has developed a drilling program aimed to examine a maximum of the active life cycle of a chosen Hawai'ian volcano by recovering a continuous, stratigraphic sequence of samples.

The core recovered will be analyzed for a broad suite of chemical characteristics - whole rock compositions, trace and rare earth element concentrations, isotopic ratios of light and heavy isotopes - by a team of collaborating scientists and the results will be interpreted in the context of their implications for the mantle plume processes that have produced these compositions. The project is a cooperative effort among the University of California at Berkeley, California Institute of Technology, and the University of Hawai'i along with a team of more than twenty collaborating researchers from more than a dozen universities and research institutes world-wide. Funding for the drilling and the follow-on research program has been provided by the National Science Foundation and the ICDP.

In order to reach the projected depth of 4.5 km or more, the planned drilling program consisted of first coring to the planned depth of a casing string, then rotary drilling to open the core hole to the required casing diameter, setting and cementing the casing, followed by another episode of coring to the next casing depth. The casing intervals for the hole were 120 m (13,375"), 600 m (9,625"), 1,830 m (7") and 3,100 m (5"). The depth and hole design required that a new coring system be fabricated with the load capacity to support 4.5 km of drill string and the ability to facilitate coring and rotary drilling from the same platform. Details of the coring system can be found at: www.dosecc.org.


See also:

 

Location

Pacific, United States of America, Hawai'i, Big Island, Hilo

 

Coordinates

19° 42' 52.41'' N, 155° 3' 15.03'' W (Please scroll down to end of page for more information.)

 

Project Start and End
  • Phase HSDP-2a
    • Begin of drilling March 13, 1999
    • End of drilling September 27, 1999
  • Phase HSDP-2b
    • Begin of drilling April 27, 2003

 

Programs and Funding

 

Principal Investigators
  • Donald J. DePaolo, University of California at Berkeley, Department of Earth and Planetary Science, Center for Isotope Geochemistry
  • Edward M. Stolper, California Institute of Technology (CALTECH), Division of Geology and Planetary Sciences
  • Donald M. Thomas, University of Hawai'i at Manoa, Hawaii Institute of Geophysics and Planetology

 

Cooperating Principal Investigators

No Co-PIs found for this project

 

Partners and Contractors

 

Keywords

Alteration, Ar, Basalts, Calcium, Clay Minerals, Cooling History, Deep Biosphere, DOSECC, Drilling, Geochemistry, Geophysics, Glass, Hawaii, Hf Isotopes, High Resolution, HSDP, ICDP-1996/18, Isotopes, Major Elements, Mantle Plume, Mauna Kea, Metamorphism, Microorganism, Microprobe, Ne, Neodymium, Noble Gases, Oxygen Isotope Analyses, Palagonites, Palagonitization, Paleointensity, Pb-isotopes, Periodicity, Petrology, Plate Tectonics, Recycling, Smectite, Strontium, Submarine Basaltic Glass, Sulfur, Thermal Regimes, U.S.A., Vitrophyres, Volcanic Systems, Volcanics, Volcano, Volcanology, Zeolites

 

Current State

Drilling operations interrupted, scientific evaluations are ongoing

 

Homepages

 

Google Earth/Maps

Show in Google Earth: Get Link Zoom in

 

(A modern web browser with Javascript enabled is needed to display the map properly)

ProjectLogo

 

News Highlights

ECORD/ICDP MagellanPlus Call for Proposals
more...

Lake Ohrid Drilling Recovered Continuous Record
more...

Lake El’gygytgyn Second Overview Paper
more...

Scientific Drilling Issue 15 Online
more...

2013 International Van Earthquake Symposium
more...

NSF Workshop: Drilling Active Tectonics and Magmatism
more...

New SAG Composition for 2013
more...

The Fennoscandian Arctic Russia - Drilling Early Earth Project
more...

Scientific Drilling Issue 14 Online
more...

Imaging the Past to Imagine our Future
more...

Daily News from Sites

Lake Ohrid: In ca 87 m depth at the Cerava hole 2B, we found a conglomerate of gravel, sand and lots of snail and...
GONAF: We had small mud losses this morning (1 m3). The rate of penetration is very low, it is 0.5 m/hr. The...
Barberton: We finished the drilling in the Barberton project at the start of May with completion of hole BARB5 in the...

Calendar

NSF Workshop on Scientific Drilling and the Evolution of the Earth System
Keep your Appointments...

NSF Workshop: Drilling Active Tectonics and Magmatism
Keep your Appointments...

NSF Workshop: Drilling into High-Enthalpy Geothermal Systems
Keep your Appointments...

Contacts

For contact information about the ICDP members please select the first letter of the name from the list below.

To see the full information or update your personal data you must login first.

ABCDEFG
HIJKLMN
OPQRSTU
VWXYZall