Daily Web Info of CCSD 2001-2002 | 2003 | 2004 | 2005

Index of the Drilling History

03/08/2005
Congratulations! Ccsd, the final depth of the borehole is 5158.00m at March 8, 2005.

03/04/2005
Some officials from National development and reform commission arrived at drill site. With Director Wang Da’s introduction, they visited the geological museum and drillsite.

03/03/2005
The direct Wang Da, the chief engineer Zhang Wei and some other engineers are going to Lankao to see about the new drill mast tomorrow.

03/02/2005
The loggers will arrived at tomorrow morning, who will log the natural gamma of the borehole next run.

02/23/2005
Today is Chinese traditional festival of lanterns; all of the engineers and drillers at ccsd still work hard.

02/22/2005
Drilling goes on well.

01/29/2005
We carried on the overall safety inspection today.

01/28/2005
The drillers are cleaning the dust on the drilling mast.

01/27/2005
Some guests from SINOPEC came to CCSD drill site visited the geological museum and drill site.

01/26/2005
We began to test wire-line coring system.

01/25/2005
Making preparations for wire-line coring.

01/24/2005
Laying down drill pipes.

01/22/2005
Seven engineers left ccsd drill site today.

01/18/2005
Some logging engineers from SchlumBerger CO. arrived at CCSD drill site.

01/17/2005
Mass spectro device in Fluid Lab was repaired. Now a few data was gotten by it.

01/16/2005
Logging was hindered at the depth of 4010 m. We had to redress.

01/15/2005
The logging engineers began to log the borehole MH-2C today.

01/14/2005
Just after CCSD MH reached the designed depth, a special wedding ceremony was held at CCSD drill site for four couples from drilling companies. They have done a lot for CCSD project. So they chose the ceremony on the special day and at the special place.

01/13/2005
The depth of CCSD MH reached 5102.18 m at 4 a.m. this morning. A small celebration was held at drill site.

01/12/2005
Madam Xu Zhiqin and other six scientists came here from Beijing this morning. In the afternoon, Mr. Wang Da led several engineers also came here from Beijing.

01/11/2005
Coring from 5083.52m to 5084.46m.

01/10/2005
Coring from 5075.16m to 5083.52m.

01/09/2005
The cat is at the drill site

01/08/2005
Clean drill-site.

01/07/2005
Beautiful the setting sun.

01/06/2005
Drilling goes on well.

01/05/2005
Drilling goes on well.

01/04/2005
The concentration of carbon dioxide rose up.

01/03/2005
Today,Some new drill pipes centralizers were transported to drill-site.

01/02/2005
A lot of small cores.

01/01/2005
January 1, the first day of the year, celebrated as a holiday in many countries.