ICDPLogo.gif San Andreas Fault Observatory at Depth
Additional Pictures
Date: 2005/08/25

ActProLogo.gif



THUMBNAILNAMEREMARKS
UN_Baker_Hughes_SAFOD-MH-ST1_1.jpgThe Baker Hughes crew work to install the logging tool that will check the quality and condition of the casing.
UN_Baker_Hughes_SAFOD-MH-ST1_2.jpgThe logging truck for casing inspection arrived this afternoon after we drilled out of the bottom of the casing and into fresh rock.
UN_Tom_and_Gisela_SAFOD-MH-ST1_1.jpgTom Torgerson and Gisela Winckler (Lamont-Doherty Earth Observatory) are preparing the instruments for sub-coring that will take place after the core barrel comes out of the hole tomorrow.
UN_Last_bit_SAFOD-MH-ST1_1.jpgThe bit on right, which was used last night to drill the cement and last 6 feet of rock, looks dwarfed by one of our old 8-1/2 inch bits.