Table VI-I


 

Year 1999

Year 2000

Year 2001

Year 2002

Year 2003

Year 2004
 
             

Sub-totals
THIS PROPOSAL              
               
Operations              
Drilling and Rig-Related Activities

$4,000,000

$6,665,000

       

$10,665,000

Logging

$84,931

$646,645

$45,801

$45,801

   

$823,178

Logging While Drilling  

$714,845

       

$714,845

Continuous Coring      

$2,801,000

   

$2,801,000

20-yr Lease Costs

$76,000

$76,000

       

$152,000

Monitoring Instrumentation

$200,000

$442,521

       

$642,521

               
Downhole Measurements and Project Management              
Zoback* (Stress, pore pressure, permeability)

$121,242

$220,757

$199,850

$237,807

$77,798

$82,376

$939,830

Hickman (Stress, pore pressure, permeability)

-

-

-

-

-

-
 
Ellsworth (Earthquake nucleation and propagation)

-

-

-

-

-

-

-
Sub-Total NSF (this proposal)

$4,482,173

$8,765,768

$245,651

$3,084,608

$77,798

$82,376

$16,738,374

               
OTHER STUDIES              
               
Core, Cuttings and Fluids Analysis              
Boulier, Gratier, Pili and Sheppard

-

-

-

-

-

-

-
Brown (clay chemistry, with Underwood)

$11,742

$38,975

$67,315

$67,613

$48,592

$47,903

$282,140

Chester

$30,529

$26,515

$5,986

$75,158

$65,235

 

$203,423

Christensen and Wang (Physical Properties)

$3,456

$59,073

$123,287

$129,475

$137,955

$66,070

$519,316

Erzinger (Real-time gas chemistry, rock composition)

-

-

-

-

-

-
 
Evans

$29,405

$23,971

$3,614

$56,477

$39,197

 

$152,664

Hacker, Boles and Chen

$54,637

$75,404

$77,501

$101,482

$81,963

$107,405

$498,392

Haimson (Triaxial rock strength)

$100,490

$87,810

$92,400

$139,700

$139,350

$142,700

$702,450

Kastner (Carbonate veins)

$45,706

$59,480

$62,799

$104,084

$105,496

$61,797

$439,362

Kharaka and Kennedy (Geochemistry of water and gasses)              
Kirschner

$32,930

$37,147

$3,848

$55,795

$44,918

 

$174,638

Lockner, Moore and Morrow (Friction, strength, perm.)

-

-

-

-

-

-

-
Rutter and Faulkner (Permeability anisotropy)

-

-

-

-

-

-

-
Tanaka and colleagues

-

-

-

-

-

-

-
Torgerson, Stute and Schlosser (Rare gases)

$40,030

$1,940

$1,940

$174,488

$105,518

$58,549

$382,465

Tullis and Goldsby (Friction, microstructures, perm.)

$37,377

$37,817

$54,603

$92,947

$99,827

$98,044

$420,615

Underwood (clay chemistry, with Brown)

$24,423

$48,459

$64,237

$38,956

$55,370

$35,973

$267,418

               
Downhole Measurements              
Iturrino and Goldberg

$35,953

$128,917

$72,974

$3,820

   

$241,664

Peching and Wohlenber

-

-

-

-

-

-

-
Ikeda, Iio and Omura

-

-

-

-

-

-

-
Williams, Lachenbruch and Sass

-

-

-

-

-

-

-
               
Site Characterization              
Arrowsmith (Geologic studies, with Rymer) 6/1/99

$87,999

$69,058

$17,870

$7,264

$7,500

 

$189,691

Fuchs and Karrenbach (3D reflection, with Klemperer et al.)

-

-

-

-

-

-

-
Klemperer, Hole, Talwani (3D reflection, with Fuchs and Karrenbach)

$219,467

$1,808,531

$224,841

$169,260

$95,056

 

$2,517,155

Li and Aki (Fault Zone Guided Waves)

$84,142

$84,699

$67,148

$69,285

$73,047

 

$378,321

McEvilly et al. (High resolution microearthquake studies)

$486,479**

$160,635

$157,463

$164,271

   

$968,848

Prodehl and Ryberg (Refraction/Tomography)

-

-

-

-

-
-

-
Roecker (High Resolution Tomography, with Thurber)

$122,451

$91,513

$54,943

     

$268,907

Rymer, Catchings, Fuis (High Res. (near surface) reflection)

-

-

-

-

-

-

-
Thurber (High Resolution Tomography, with Roecker)

$41,157

$197,125

$67,905

     

$306,187

               
Fault Zone Monitoring              
Harbin

-

-

-

-

-

-

-
Hunter

-

-

-

-

-

-

-
Johnston

-

-

-

-

-

-

-
Malin

$129,737

$180,495

$64,862

$42,283

   

$417,377

McGarr

-

-

-

-

-

-

-
Roeloffs

-

-

-

-

-

-

-
               
               
Sub-Total NSF (other proposals)

$1,618,110

$3,217,564

$1,285,536

$1,492,358

$1,099,024

$618,441

$9,331,033

               
* Investigators with names that are underlined are requesting funding from NSF. Others are requesting funding from other Federal agencies or foreign governments. The sum shown on this line is the total of Zoback's budget minus Operational Costs.
** This sum represents funding requested starting in 1998.


Back to Figure List | Back to Section VI